ECRs on LS1 activities:
- 2 ECRs for the Collimators with embedded BPMs (RELEASED):
- LHC-TC-EC-0003,Replacement of TCT in IR1, IR2, IR5 and of TCSG Collimators in IR6 with Collimators with Embedded BPM Buttons
- LHC-LJ-EC-0029,Modification of the IR8 Layout and Installation of TCT Collimators with BPM Buttons
- 1 ECR for the installation of the TCL-4 in IR1 and IR5 (RELEASED): :
- LHC-LJ-EC-0032, Installation of Absorbers for Physics Debris (TCLP type collimators) on both sides of IP1 and IP5 in front of D2/Q4.
- 2 ECRs for the space reservation of the TCL-6 and installation in IR1 and IR5
- LHC-LJ-EC-0033, Space Reservation for Physics Debris Absorbers (TCLP) on both sides of IP1 and IP5 in front of Q6 Quadrupole.(RELEASED):
- LHC-LJ-EC-0040, Installation of Physics Debris Absorbers (TCL) on both sides of IP1 and IP5 in front of Q6 Quadrupole. (RELEASED):
- 1 ECR for installation of passive absorbers in IR3 (RELEASED):
- LHC-TCAPD-EC-0001, Installation of Additional Passive Absorbers in IR3 to Protect the Warm Q5.
Additional ECRs related to Collimation