Collimation project
Leader: R. Assmann
Project engineer: O. Aberle
Organization, schedule, budget, milestones, progress monitoring, design decisions
Project steering
E. Chiaveri
report to
AB department
(S. Myers, LTC)
Beam aspects
R. Assmann, LCWG
System design, optics, efficiency, impedance (calculation, measure-ment), beam impact, tolerances, diffusion, beam loss, beam tests, beam commissioning, functional specification (8/03), operational scenarios, support of operation
Energy deposition, radiation
A. Ferrari
(collimator design, ions)
J.B Jeanneret
(BLM’s, tuning)
M. Brugger
(radiation impact)
FLUKA, Mars studies for energy deposition around the rings. Activation and handling requirements.
Collimator engineering & HW support
O. Aberle
Sen. advice: P. Sievers
Conceptual collimator de-sign, ANSYS studies, hardware commissioning, support for beam tests, series production, installation, maintenance/repair, electronics&local control, phase 2 collimator R&D
Mechanical eng-ineering (EST)
Coord.: M. Mayer
Engin.: A. Bertarelli
Sen. designer: R. Perret
Technical specification, space budget and mecha-nical integration, thermo-mechanical calculations and tests, collimator mechanical design, prototype testing, prototype production, drawings for series production.
Resources/planning
R. Assmann, E. Chiaveri,
M. Mayer, J.P. Riunaud
Machine Protection
R. Schmidt
Vacuum
M. Jimenez
Beam instrum.
B. Dehning
Dump/kickers
B. Goddard
Integration into operation
M. Lamont
Supply & ordering
O. Aberle, A. Bertarelli
Local feedback
J. Wenninger
Controls
AB/CO
Electronics/radiation
T. Wijnands