LHC Collimation Project

Home of the Project for the LHC Collimation System

 
Top Project Team Notes Collimator List Sounds/Movies Meetings
Links Papers Talks (WG) Layout IR3/7 Collimator DB Pictures
MP Tests Sounds 2011        
 

Ralph's PPT files

 
Date Forum Title
     
19.05.2008 12 internal Reduced Collimator Lifetime
28.04.2008 11 internal Damage Limits for LHC Collimators
23.04.2008 10 LTC Reducing Radiological Impact in IR7 (PDF)
21.04.2008 9 LHCCWG Updates on LHC Collimation
03.04.2008 8 WS Background Collimation
01.04.2008 7 LPC Delay of TCTVB’s in IR2 and IR8
14.03.2008 6 ICC Collimation Installation Update
10.03.2008 5 ALICE TCTVB at IR2
05.03.2008 4 ELTC Quenches with Beam
31.01.2008 3 P2DM Introductory Remarks
25.01.2008 2 P2SM Phase 2 Specification and Implementation Meeting
15.01.2008 1 ALICE Look at TCTVB Issue at IR2
19.12.2007 36 MPsWG Tevatron and Need for Adjustable BLM Thresholds
07.12.2007 35 MAC Plan for Collimator Commissioning
05.10.2007 34 BEAM07 Summary Session Advanced Collimation
01.10.2007 33 BEAM07 Collimation Issues for the Two LHC+ Scenarios and Future Plans
24.11.2007 32 KET Bad Honnef Status des LHC
15.11.2007 31 GSI Seminar Beam Loss and Collimation at the LHC
15.11.2007 30 GSI meeting Presentation of ColMat JRA
01.11.2007 29 IUWG Collimation Issues for the Phase 1 Insertion Upgrade
15.10.2007 28 - Memo: Collimation Plan, Explanation Limitations
11.10.2007 27 LHC Budget and Schedule Review Review Collimation Project
10.10.2007 26 MPsWG MPS aspects of the Collimation system commissioning (DOC)
05.10.2007 25 BEAM07 Summary Session Advanced Collimation
01.10.2007 24 BEAM07 Collimation Issues for the Two LHC+ Scenarios and Future Plans
10.09.2007 23 ESGARD/OMIA Transnational Access: "HiRadMat" (Irradiation tests)
10.09.2007 22 ESGARD/OMIA JRA on Collimators and Materials for High Power Accelerators
03.09.2007 21 WS on materials and collimators Requirements from LHC Collimation
16.08.2007 20 SLAC Seminar The LHC Challenge on Beam Loss and Collimation
31.07.2007 19 AccApp07 Handling High Power Beams in the LHC
24.07.2007 18 CERN-CERCA CERN's expectations
15.06.2007 17 MIBWG Beam Loss and Halo in IR1 and IR5
15.06.2007 16 MAC Collimation Update
13.06.2007 15 Sector Test Meeting Collimator Availability
31.05.2007 14 AB Seminar Status of LHC Collimation and Outlook
14.05.2007 13 White Paper Info I Work Packages
14.05.2007 12 White Paper Info II Work Flow
14.05.2007 11 White Paper Info III Organization
14.05.2007 10 White Paper Info IV Rough Specification
11.05.2007 9 White Paper Meeting Collimation drafts
08.05.2007 8 LHCCWG Two Beam Operation
27.04.2007 7 White Paper Meeting Collimation
30.03.2007 6 - CERN-CERCA Top Management (PDF)
02.03.2007 5 ICC Collimator Status
07.02.2007 4 - CERCA Contract
07.02.2007 3 CSM Slides for steering meeting
17.01.2007 2 - Slides for Ghislain
11.01.2007 1 CDM Design Passive Absorbers
14.12.2006 30 ATB group meeting Collimation WP and Organization (incl. Phase 2)
12.12.2006 29 COCOST review Integration into MP - Considerations -
12.12.2006 28 COCOST review Introduction
08.12.2006 27 MAC Phase 2 Collimation Concepts
08.12.2006 26 MAC New LHC collimator installation schedule & impact on 450 GeV & 7 TeV run
06.12.2006 25 LTC Highlights 2006 Collimation MD’s in the SPS and TT40
04.12.2006 24 LOC Collimation Update
28.11.2006 23 LHCCWG Collimation During Ramp and Squeeze
03.11.2006 22 TCC Latest Planning for Collimators
20.10.2006 21 LUMI06 Intensity Limitations: Collimation in PS2, SPS, LHC
13.10.2006 20 CERCA meeting CERN's view (compressed)
11.10.2006 19 LHC Budget and Schedule Review LHC Collimation Status (compressed)
27.09.2006 18 LTC New Collimator Installation Schedule
14.09.2006 17 LHCb week Commissioning and Operation of LHC 2007, 2008 and Beyond
13.09.2006 16 MARIC Status of LHC collimators and implications on machine installation
22.08.2006 15 CSM Status of Collimator Production and Consequences
18.07.2006 14 CSM Review of Problem Contracts and High Priority Tasks for the Next Weeks
07.07.2006 13 CERCA meeting CERN's view
05.07.2006 12 LTC Minimum Required Collimator Settings
01.07.2006 11 EPAC06 papers EPAC06 papers:
Final LHC Collimation System (WORD)
Crystal-based collimation
Reduction of CLIC FF
27.06.2006 10 EPAC06 The Final Collimation System for the LHC
16.06.2006 Talk F. Delsaux Montage des Collimateur
15.06.2006 9 MAC Collimation Status
Movie: Thermal deformation
07.06.2006 8 LTC Collimation - Some News and Decisions
05.05.2006 7 MPWG Input to ongoing discussions (on MP)
03.05.2006 6 LHCCWG 450 GeV Commissioning: Collimation
15.03.2006 5 LTC Operation and Setup Strategy for the LHC Collimators (PDF)
01.03.2006 - HW commissioning paper
28.02.2006 4 Meeting coll-vac-inst Collimator Production and Installation
28.02.2006 3 JUAS Future Accelerators
10.02.2006 2 CERCA visit CERN Visit to CERCA
24.01.2006 1 Chamonix Beam Commissioning of the Collimation Systems
19.01.2005 34 Cost review XLS, PDF
01.01.2006 - Highlights collimation project 2005
02.12.2005 33 TCC Installation Readiness Collimators
29.11.2005 32 Radiation Day LHC Collimation
22.11.2005 31 CLIC BDS day Highlights from the CLIC stabilization study and recommendations for future investigations
04.11.2005 30 Motorization review Review Movement & Motorization
31.10.2005 29 ABMB Status of the Collimation Project
28.09.2005 28 LTC Performance with Deformed Jaws
22.09.2005 27 Controls Review Controls for the LHC Collimation System
12.09.2005 26 CWG Performance with Deformed Jaws
12.07.2005 25 AB-TS TS Work Packages on Collimation within the Collimation Project
12.07.2005 24 ATB section leader meeting Status of LHC Collimation and Work Packages (PDF)
06.07.2005 - Collimation Work Packages
04.07.2005 23 ABMB Status of the Collimation Project
29.06.2005 22 LTC Collimation Schedule
15.06.2005 21 SLAC Collimation Project News and Introduction from CERN Side
13.06.2005 20 CWG Possible Collimation Priorities
06.06.2005 19 CERCA visit Visit to CERCA company
01.06.2005 18 Installation Meeting Collimator Installation
17.05.2005 17 CPM Project Organization & Status
13.05.2005 16 COCOST Controls Requirements from Collimator Beam-Based Alignment - Preliminary Thoughts - (EXCEL)
02.05.2005 15 CWG Phase 2 Work at SLAC and CERN
29.04.2005 14 Background WG Input to Background WG
20.04.2005 13 Academic Training CERN The LHC Experiment-Machine Interface Lecture 3: The LHC Accelerator (PDF)
13.04.2005 12 - Operational views
11.04.2005 11 LHC Machine Protection Review The Role of the Collimation System in Protecting the Aperture
06.04.2005 10 US-LARP meeting Project News & Cleaning Efficiency of the LHC Collimation System
23.03.2005 9 LTC Controls Requirements for the LHC Collimation System
10.03.2005 8 AB Seminar The LHC Collimation System
08.03.2005 7 HHH Workshop
(crystal collimation)
Summary impressions
07.03.2005 6 HHH Workshop
(crystal collimation)
LHC Collimation Requirements
05.03.2005 5 AMT Workshop
(quenches)
Summary notes R. Assmann
03.03.2005 4 AMT Workshop
(quenches)
Introductory remarks
01.03.2005 3 JUAS Future accelerators (PDF)
Sound: SPS beam on TED
Sound: SPS beam on collimator
Movie: IR7 layout (avi/mpeg)
Movie: SLC beam with tails
Movie: SLC beam before/after tuning
28.01.2005 2 Internal Presentation Budget 2005
20.01.2005 1 CHAMONIX Collimators and Beam Absorbers for Cleaning and Machine Protection
31.12.2004 47 - Collimation Highlights 2004
09.12.2004 46 MAC Collimation, optical imperfections, cleaning dynamics
08.12.2004 45 MAC Update on LHC Collimation
Sound: Beam on TED or collimator
Movie: IR7 (AVI or MPEG) - Collimator closing (WMV)
26.11.2004 44 CWG Abstracts for PAC 2005
19.11.2004 43 CPM Collimator Production Responsibilities
07.11.2004 42 HHH 2004 Collimation
04.11.2004 41 ABP SLM Status of LHC Collimation Project
27.10.2004 40 LTC Preliminary results from SPS collimator MDs
20.10.2004 39 US LARP Status of LHC Collimation at CERN
18.10.2004 38 - Collimator BBQ (R. Jones et al)
15.10.2004 37 APC Preliminary results from 1st SPS collimator MD
06.10.2004 36 LTC Preparation for Chamonix 2005
05.10.2004 35 - Shielding 2004
28.09.2004 34 BINP Slides for BINP
24.09.2004 33 TCC Layout Changes in IR7
24.09.2004 32 - Status of various collimators/absorbers
20.09.2004 31 - Slides for Lucio
19.09.2004 30 - Sketch collimator scheme
17.09.2004 29 APC TT40 Collimator Tests
30.08.2004 28 CWG Discussion on the Report from the Collimation Review
30.08.2004 27 ABMB Status of the LHC Collimation Project
28.07.2004 26 CERN summer school The CLIC Study
27.07.2004 25 RMS Review Beam Requirements for the LHC II/II
21.07.2004 24 LTC Report on Outcome of External Review for the Collimation Project
19.07.2004 23 LEMIC Collimators in the Experimental Insertions
01.07.2004 22 Collimation Review Collimator Functionality, Performance and First View on Set-up and Optimization
01.07.2004 21 - Major Issues 2004
30.06.2004 20 Collimation Review The LHC Collimation Project: Implementation of a Phased Approach
14.06.2004 19 - Project constraints for LHC collimator motorization & local control
11.06.2004 18 LHC Injection Day LHC Injection: Requirements and Aperture
10.06.2004 17 CDM List of Collimators Included in the Collimation Project and the TS mandate
02.06.2004 16 LTC Collimators in the Experimental Insertions - Proposal -
28.05.2004 15 CWG Impressions on RHIC Collimation System
28.05.2004 14 TCC Baseline layout in cleaning insertions IR3 and IR7
20.05.2004 13 US-LARP LHC Collimation Overview
14.05.2004 12 - TCDQ meeting
05.05.2004 11 ELAN workshop THE CLIC STABILITY STUDY
29.04.2004 10 CDM Types and locations of collimators
29.04.2004 9 - Slides for Francesco
23.04.2004 8 - Air duct study
02.04.2004 7 APC LHC collimator MDs in the SPS - Overall planning and goals
19.03.2004 6 - Project workflow
19.03.2004 5 - Project organization
17.03.2004 4 LTC Layout of IR3
01.03.2004 3 JUAS FUTURE ACCELERATORS (version d)
03.02.2004 2 LEMIC LHC Collimation Project - Status and News -
15.01.2004 1 CHAMONIX Status of the LHC Collimation System (Version d)
17.12.2003 35 CWG Schematics for simplified energy deposition study in IR7
12.12.2003 34 MAC Choices for the Collimation System & Collimation Impedance Issues (Version b)
25.11.2003 33 LTC New Optics and Cleaning Design for IR7 (Version d)
19.11.2003 32 LTC Review LHC Ring Collimation – Overview –
14.11.2003 31 CWG Different Optics for IR7 - Review and Proposal - (final)
11.11.2003 30 Optics team meeting Different Optics for IR7 - Review and Proposal -
11.11.2003 29 ABIC SPS/TT40 tests of LHC collimator
06.11.2003 28 ATB meeting Energy deposition studies
04.11.2003 27 Optics Team Meeting Different Optics for IR7
29.10.2003 26 LTC Update on the LHC collimation system design : status, deadlines and next steps
10.10.2003 25 CWG SPS-TT40: Towards the approval
03.10.2003 24 CDM Schedule
02.10.2003 23 AB seminar Status of the LHC Collimation System
29.09.2003 22 Optics team meeting Collimation Optics Studies (different solutions, performance)
26.09.2003 21 CWG Info on Optics Studies
19.09.2003 20 AB/CO meeting The LHC Collimation Project
21.08.2003 19 - Slides for Lyn
24.07.2003 18 - The LHC Collimation Project and EST
23.07.2003 17 CERN summer school The CLIC Concept for a Future Collider at the Energy Frontier
16.07.2003 16 ATB group meeting The LHC Collimation Project
07.07.2003 15 CWG Studies on a Different Optics and a Low Impedance Solution for Cleaning Insertion IR7
25.06.2003 14 LTC Introduction and Requirements; Proposal
11.06.2003 13 LTC Functional Specification of Luminosity Monitoring
03.06.2003 12 LHC Days 2003 The Collimation System and its Impact on the Other Machine Systems
30.05.2003 11 CWG Towards a Proposal for the LTC on June 25th
28.05.2003 10 CWG Shadow study + Loss rate specification per collimator
20.05.2003 9 PAC03 DESIGNING AND BUILDING A COLLIMATION SYSTEM FOR THE HIGH-INTENSITY LHC BEAM
19.05.2003 8 ATB group meeting ATB Tasks for the Collimation Project
08.04.2003 7 LEMIC Status of the LHC Collimation System Towards a More Robust System
13.03.2003 6 MAC Status of the LHC Collimation System Towards a More Robust System
    MPEG movie of irregular dump
05.03.2003 5 Chamonix 2003 Collimators and Cleaning, Could this Limit the LHC Performance ?
                   4   Why Inject Beam During the Sector/Quadrant Test?
03.10.2002 3 Nanobeam 2002 CLIC STABILITY STUDY
29.07.2002 CERN summer school The CLIC Concept for a Future Collider at the Energy Frontier
28.05.2002 2 EPAC02 Requirements and Design Criteria for the LHC Collimation System
04.02.2002 1 LC02 The CLIC Stability Study
19.11.2001 BI day 01 Status of the LHC Beam Cleaning Study Group
16.11.2001 APAC01 LEP Memorandum
13.06.2001 4 CSS Progress on stabilization equipment
29.05.2001 3 DESY seminar Colliding Nanometer-Size Beams in CLIC Using Modern Stabilization Technology
15.05.2001 2 CSS Status of NLC fast (intra-train) feedback
21.02.2001 1 CSS Second meeting of the CLIC stability study
07.11.2000 2 ICFA Beam Dynamics: GM Ground Motion and Vibration Problems in Linear Colliders
31.05.2000 1 AP meeting What is going on for beam stability?
01.12.1999 BI day 99 Daily Use of Online Tools for Luminosity-Optimization
12.09.1999 2 AP meeting Alignment and Correction Methods
04.08.1999 1 AP meeting The Possible Use of LIAR for CLIC FF simulations
27.01.1999 Chamonix 1999 Injection and Accumulation of High Currents
27.01.1999 Chamonix 1999 A Tale of (De)Polarization above 60 GeV
01.12.1998 BI day 98 Luminosity from Lifetime
     
Year Number of talks  
1999 1  
2000 2  
2001 4  
2002 3  
2003 35  
2004 46  
2005 34  
2006 29  
2007 36  
2008 12  

  RWA, Thursday, 05. April 2012 11:07 +0200