LHC Collimation Project Header

 LHC Collimation Project

Home of the Project for the LHC Collimation System

 
Home Project Team Notes Collimator List Sounds/Movies Meetings
Links Papers Talks (WG) Layout IR3/7 Collimator DB Pictures
MP Tests Sounds 2011 Lossmaps Tracking Code LS1 activities ColUMM
SLAC collimation 2014 Commissioning LS2 activities

2013-02-14: 1.38 TeV Colliding RP in

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V

10-02-2013: 450GeV Inj.Prot. IN (pp)

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V
B1+B2 NEG
B1+B2 POS

11-02-2013: 450GeV Inj.Prot. OUT (pp)

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V

11-02-2013: 1380GeV Flat Top (pp)

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V

11-02-2013: 1380GeV Colliding XRin (pp)

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V
B1+B2 NEG
Asyn. Dump

12-02-2013: 1380GeV Colliding B1-H (pp)

  Description      All IR's         Relevant IR    
B1-H

02-02-2013: 4TeV Flat Top B1 Pb, B2 p

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V

02-02-2013: 4 TeV EndSqueeze B1 Pb, B2 p

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V

01-02-2013: 4TeV Colliding XR out (B1:Pb, B2:p)

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V
B1-H
B1-V
B2-H
B2-V
B1+B2 POS

02-02-2013: 4TeV Colliding XR in (B1:Pb, B2:p)

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V
B1+B2 NEG

28-01-2013: 4TeV Colliding, after alignment of IP2 (RP out)

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V
B1+B2 NEG
B1+B2 POS

2013-01-20: Qualification lossmaps at 4TeV Colliding (only B1 protons)

  Description      All IR's         Relevant IR    
B1-H
B1-V
B1-NEG

2013-01-18: Qualification lossmaps at 4TeV Flat Top After Cogging durng p-Pb

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V

2013-01-18: Qualification lossmaps at 4TeV End of Squeeze separeted during p-Pb (B1:p, B2:Pb)

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V

2013-01-19: Qualification lossmaps at 4TeV Colliding RP out during p-Pb (B1:p, B2:Pb)

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V

2013-01-19: Qualification lossmaps at 4TeV Colliding RP in during p-Pb (B1:p, B2:Pb), Analysis IR3 hierarchy

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V
B1+B2 NEG
B1+B2 POS

2013-01-19: Qualification lossmaps at 450GeV Injection Protection IN during p-Pb (B1:p, B2:Pb)

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V

2013-01-19: Qualification lossmaps at 450GeV Injection Protection OUT during p-Pb (B1:p, B2:Pb)

  Description      All IR's         Relevant IR    
B1-H
B1-V
B1-NEG
B1-POS
B2-H
B2-V
B2-NEG
B2-POS

2012-09-26: Qualification lossmaps at 4TeV during Physics with Roman pots (Totem and Alfa) IN (Analysis)

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V
B1+B1 NEG

2012-09-13: Lossmaps for the p-PB MD run at 4TeV during Physics ADT excitation on non-colliding bunches

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V

2012-07-01: Qualification lossmaps at 4TeV After Squeeze (Analysis)

  Description      All IR's         Relevant IR    
B1-H
B1-V
B2-H
B2-V

2012-07-01: Qualification lossmaps at 4TeV Physics (Totem and Alfa IN)(Analysis)

  Description       All IR's        Relevant IR   
B1-H
B1-V
B2-H
B2-V
B1+B2 NEG

2012-07-01: Qualification lossmaps at 450GeV (Injection Protection IN)(Analysis)

  Description       All IR's        Relevant IR   
B1-H
B1-V
B2-H
B2-V

2012-07-01: Qualification lossmaps at 450GeV (Injection Protection OUT)(Analysis)

  Description       All IR's        Relevant IR   
B1-H
B1-V
B2-H
B2-V
B1+B2 NEG
B1+B2 POS

2012: Lossmaps at 4 TeV Flat Top TCSG.5L3.B1 with 1 Jaw Stacked

  Description       All IR's        Relevant IR   
B1+B2 NEG

2012: Lossmaps at 4 TeV Collision Settings non-colliding

  Description       All IR's        Relevant IR   
B1-H
B1-V
B2-H
B2-V
B1+B2 NEG
B1+B2 POS

2012: Lossmaps at 4 TeV After Squeeze

  Description       All IR's        Relevant IR   
B1-H
B1-V
B2-H
B2-V

2012: Lossmaps at 4 TeV Flat Top

  Describe       All IR's        Relevant IR   
B1-H
B1-V
B2-H
B2-V
B1+B2 NEG

Last Update: July 3rd, 2012 by B.Salvachua