LHC Collimation Project Header

 LHC Collimation Project

Home of the Project for the LHC Collimation System

 
Home Project Team Notes Collimator List Sounds/Movies Meetings
Links Papers Talks (WG) Layout IR3/7 Collimator DB Pictures
MP Tests Sounds 2011 Lossmaps Tracking Code LS1 activities ColUMM
SLAC collimation 2014 Commissioning LS2 activities
 

Pictures of LHC Collimators

Click below for pictures in various categories. Click to the thumbnail for high-resolution picture - save to disk with right click!
Tertiary Collimatos with BPMs
Highlight pictures Installed LHC prototype collimator Installation into SPS and TT40 Views of assembled collimator Views of collimator production People with LHC collimator

Tertiary Collimators with BPMs


TCTP


First 2 TCTP


Highlights      
           

 
Collimator in SPS ring installed Top view open collimator View along beam path Carbon-carbon jaw End view assembled jaw  

Installed LHC prototype collimator      
           

       
Collimator in SPS ring installed Collimator in TT40 installed        

Installation of prototypes into SPS ring and TT40

   
           
Installation in SPS ring Installation in SPS ring Installation in SPS ring Installation in TT40 Installation in TT40 Installation in TT40
     
Installation in TT40 Installation in TT40 Material test and TED dump      

Views of assembled collimator

     
           
Top view open collimator View along beam path View open tank End view open collimator RF contacts along beam path Detail: Bellows
           
Detail: Bellow Laboratory measurements Laboratory measurements End of collimator detail RF contacts and Temp sensors Collimator side view
Collimator in laboratory Collimator controls RF contacts along beam path RF contacts along beam path RF contacts on single jaw RF contacts along beam path

Views of collimator production

     
           
End view jaw Moving table Carbon-carbon jaw Jaw cooling supports Jaw cooling supports End view partially assembled
Installation of jaw into tank One jaw installed One jaw installed Installation of jaw into tank Vacuum tank Detail vacuum tank
Vacuum tank Without RF contacts Detail Carbon-carbon jaw Carbon-carbon jaw End view jaw
           
     
Assembled jaw Clamp parts Tank assembly      

People with LHC collimator

     
           
Collimator in SPS During construction During construction During construction During construction During construction
     
During construction External review committee External review committee      

  RWA, Thursday, 05. April 2012 11:07 +0200