Basic Design Parameters and Location for Collimators in the LHC


The list is divided into different types of collimators. A "collimator type" is defined by the same or very similar basic design parameters for the collimator hardware.

This is a working list. At the moment 7 different design varieties can be distinguished for phase 1. Types similar to secondary collimator design are listed first, devices with large design changes are listed towards the end:
 

Type Purpose Acronym Number Responsibility
         
  Variations of the TCSG design (phase 1 )      
1 Secondary collimator (phase 1) TCSG 35 Collimation Project
  Absorbers for injection protection (type A) TCLI(a) 3 Collimation Project
2 Primary collimator TCP 11 Collimation Project
3 Tertiary collimator (type A) TCT(a) 11 Collimation Project
4 Absorbers for physics debris TCLP 5 Collimation Project
  Absorbers for showers in cleaning insertions TCLA 16-24 (tbd) Collimation Project
5 Transfer line collimators TCDI   AB/BT, AB/ATB
         
  Designs with strong differences or new designs (phase 1)    
6 Scrapers TCHS 9 Collimation Project
7 Tertiary collimator (type B)
Absorbers for injection protection (type B)
TCT(b), TCLI(b) 8 Collimation Project
         
Completely new designs (phase 2)
8 Secondary collimator (phase 2) TCSM 33 Collimation Project
 

Primary collimators in IR3 and IR7
   
Basic design parameters
   
TCP
Type Primary collimator
Number of beams in tank 1
Material for jaws C-C
Number of jaws in tank 2
Scheme of jaws parallel jaw surfaces
Collimation plane various
Jaw length 1.2 m
  Flat top 0.6 m
  Tapering 0.1 m at each end
Width of jaw 80 mm
Depth of jaw 25 mm
RF contacts required yes
Cooling of jaw yes
Cooling of vacuum tank yes
Length of vacuum tank 1480 mm
Minimum gap ≤ 0.5 mm
Maximum gap ≥ 60 mm
Distance to center of other beam pipe ≥ 194 mm
Gap control yes
  Gap width yes
  Gap center yes
  Center across zero 5 mm
Angle control (independent per jaw) yes
   
List of components
   
 
Name Location s
[m]
a [deg] Phase Count for 2004 call for tender
IR7 beam1        
TCP.D6L7.B1 19789.184 90.0 1 1
TCP.C6L7.B1 19791.184 0.0 1 1
TCP.B6L7.B1 19793.184 127.5 1 1
TCP.A6L7.B1 19795.184 50.9 4 0
IR7 beam2        
TCP.D6R7.B2 20199.140 90.0 1 1
TCP.C6R7.B2 20197.140 0.0 1 1
TCP.B6R7.B2 20195.140 127.5 1 1
TCP.A6R7.B2 20193.140 51.0 4 0
IR3 beam1        
TCP.6L3.B1 6487.671 0.0 1 1
IR3 beam2        
TCP.6R3.B2 6841.770 0.0 1 1
         
Total       8
   
  Number of spares: 3
  Number of components phase 1 with spares: 11
     
  Total to be included in 2004 call for tender: 11

Secondary collimators in IR3 and IR7 (and IR6)
   
Basic design parameters
   
TCSG
Type Secondary collimator
Number of beams in tank 1
Material for jaws C-C
Number of jaws in tank 2
Scheme of jaws parallel jaw surfaces
Collimation plane various
Jaw length 1.2 m
  Flat top 1.0 m
  Tapering 0.1 m at each end
Width of jaw 80 mm
Depth of jaw 25 mm
RF contacts required yes
Cooling of jaw yes
Cooling of vacuum tank yes
Length of vacuum tank 1480 mm
Minimum gap ≤ 0.5 mm
Maximum gap ≥ 60 mm
Distance to center of other beam pipe ≥ 194 mm
Gap control yes
  Gap width yes
  Gap center yes
  Center across zero 5 mm
Angle control (independent per jaw) yes
   
List of components
   
 
Name Location s
[m]
a [deg] Phase Count for 2004 call for tender
IR7 beam1        
TCSG.B6L7.B1 19828.679 41.4 4 0
TCSM.B6L7.B1 19830.679 39.9 4 0
TCSG.A6L7.B1 19832.679 141.1 1 1
TCSM.A6L7.B1 19834.679 142.5 2 0
TCSG.B5L7.B1 19891.906 143.5 1 1
TCSM.B5L7.B1 19893.906 141.6 2 0
TCSG.A5L7.B1 19895.906 40.7 1 1
TCSM.A5L7.B1 19897.906 42.7 2 0
TCSG.D4L7.B1 19917.236 90.0 1 1
TCSM.D4L7.B1 19919.236 90.0 2 0
TCSG.C4L7.B1 19946.421 133.6 4 0
TCSM.C4L7.B1 19948.421 134.5 4 0
TCSG.B4L7.B1 19987.162 0.0 1 1
TCSM.B4L7.B1 19989.162 0.0 2 0
TCSG.A4L7.B1 19991.162 134.6 1 1
TCSM.A4L7.B1 19993.162 135.7 2 0
TCSG.A4R7.B1 19995.162 46.3 1 1
TCSM.A4R7.B1 19997.162 45.2 2 0
TCSG.B4R7.B1 20043.903 135.9 4 0
TCSM.B4R7.B1 20045.903 136.4 4 0
TCSG.A5R7.B1 20082.418 37.3 4 0
TCSM.A5R7.B1 20084.418 39.2 4 0
TCSG.B5R7.B1 20086.418 141.5 1 1
TCSM.B5R7.B1 20088.418 139.6 2 0
TCSG.C5R7.B1 20098.418 90.0 4 0
TCSM.C5R7.B1 20100.418 90.0 4 0
TCSG.D5R7.B1 20102.418 51.4 1 1
TCSM.D5R7.B1 20104.418 53.3 2 0
TCSG.E5R7.B1 20106.418 130.5 1 1
TCSM.E5R7.B1 20108.418 128.5 2 0
TCSG.6R7.B1 20141.023 0.5 1 1
TCSM.6R7.B1 20143.023 0.5 2 0
IR7 beam2        
TCSG.B6R7.B2 20159.646 41.2 4 0
TCSM.B6R7.B2 20157.646 39.7 4 0
TCSG.A6R7.B2 20155.646 141.3 1 1
TCSM.A6R7.B2 20153.646 142.8 2 0
TCSG.B5R7.B2 20096.418 143.6 1 1
TCSM.B5R7.B2 20094.418 141.7 2 0
TCSG.A5R7.B2 20092.418 40.6 1 1
TCSM.A5R7.B2 20090.418 42.5 2 0
TCSG.D4R7.B2 20071.088 90.0 1 1
TCSM.D4R7.B2 20069.088 90.0 2 0
TCSG.C4R7.B2 20041.903 133.6 4 0
TCSM.C4R7.B2 20039.903 134.5 4 0
TCSG.B4R7.B2 20005.162 0.0 1 1
TCSM.B4R7.B2 20003.162 0.0 2 0
TCSG.A4R7.B2 20001.162 132.1 1 1
TCSM.A4R7.B2 19999.162 133.3 2 0
TCSG.A4L7.B2 19985.162 42.1 1 1
TCSM.A4L7.B2 19983.162 41.0 2 0
TCSG.B4L7.B2 19944.421 135.6 4 0
TCSM.B4L7.B2 19942.421 136.2 4 0
TCSG.A5L7.B2 19905.906 37.3 4 0
TCSM.A5L7.B2 19903.906 39.2 4 0
TCSG.B5L7.B2 19901.906 141.5 1 1
TCSM.B5L7.B2 19899.906 139.5 2 0
TCSG.C5L7.B2 19889.906 90.0 4 0
TCSM.C5L7.B2 19887.906 90.0 4 0
TCSG.D5L7.B2 19885.906 51.4 1 1
TCSM.D5L7.B2 19883.906 53.3 2 0
TCSG.E5L7.B2 19881.906 130.5 1 1
TCSM.E5L7.B2 19879.906 128.5 2 0
TCSG.6L7.B2 19847.301 0.5 1 1
TCSM.6L7.B2 19845.301 0.5 2 0
IR3 beam1        
TCSG.5L3.B1 6521.043 0.0 1 1
TCSM.5L3.B1 6523.043 0.0 2 0
TCSG.4R3.B1 6707.526 0.0 1 1
TCSM.4R3.B1 6709.526 0.0 2 0
TCSG.A5R3.B1 6718.921 170.8 1 1
TCSM.A5R3.B1 6720.921 170.3 2 0
TCSG.B5R3.B1 6724.741 10.8 1 1
TCSM.B5R3.B1 6726.741 11.4 2 0
IR3 beam2        
TCSG.5R3.B2 6808.399 0.0 1 1
TCSM.5R3.B2 6806.399 0.0 2 0
TCSG.4L3.B2 6621.916 0.0 1 1
TCSM.4L3.B2 6619.916 0.0 2 0
TCSG.A5L3.B2 6610.521 170.8 1 1
TCSM.A5L3.B2 6608.521 170.3 2 0
TCSG.B5L3.B2 6604.701 10.8 1 1
TCSM.B5L3.B2 6602.701 11.5 2 0
         
Total       30
   
  Number of spares: 3
  Number of components phase 1 (with spares): 33
     
  AB/BT request for TCS in IR6: 2
     
  Total to be included in 2004 call for tender: 35

SCRAPERS in IR3 and IR7
   
Basic design parameters
   
TCHS
Type Halo Scrapers
Number of beams in tank 1
Material for jaws tbd
Number of jaws in tank 1
Scheme of jaws n/a
Collimation plane various
Jaw length ~ cm
  Flat top tbd
  Tapering tbd
Width of jaw tbd
Depth of jaw tbd
RF contacts required yes
Cooling of jaw yes
Cooling of vacuum tank yes
Length of vacuum tank tbd
Minimum setting from beam axis ≤ 0.5 mm
Maximum setting from beam axis ≥ 60 mm
Distance to center of other beam pipe ≥ 194 mm
Position control yes
  Jaw position yes
  Position across zero 5 mm
Angle control (independent per jaw) no
   
List of components
   
 
Name Location s
[m]
a [deg] Phase Count for 2004 call for tender
IR7 beam1        
TCHSV.6L7.B1 19796.784 90.0 1 0
TCHSH.6L7.B1 19797.984 0.0 1 0
TCHSS.6L7.B1 19799.184 136.6 2 0
IR7 beam2        
TCHSV.6R7.B2 20191.540 90.0 1 0
TCHSH.6R7.B2 20190.340 0.0 1 0
TCHSS.6R7.B2 20189.140 132.2 2 0
IR3 beam1        
TCHSH.6L3.B1 6489.271 0 1 0
IR3 beam2        
TCHSH.6R3.B2 6840.170 0 1 0
         
Total Phase 1     6 0
   
  Number of spares: 3
  Number of components phase 1 with spares: 9
     
  Total to be included in 2004 call for tender: 0

TERTIARY collimators type A
   
Basic design parameters
   
TCT(a)
Type Tertiary collimator at D2
Number of beams in tank 1
Material for jaws W (backup solution: Cu)
Number of jaws in tank 2
Scheme of jaws parallel jaw surfaces
Collimation plane various
Jaw length 1.2 m
  Flat top 1.0 m
  Tapering 0.1 m at each end
Width of jaw 80 mm
Depth of jaw 25 mm
RF contacts required yes
Cooling of jaw yes
Cooling of vacuum tank yes
Length of vacuum tank 1480 mm
Minimum gap ≤ 4.0 mm
Maximum gap ≥ 60 mm
Distance to center of other beam pipe ≥ 165 mm
Gap control yes
  Gap width yes
  Gap center yes
  Center across zero 5 mm
Angle control (independent per jaw) yes
   
List of components
   
 
Name Location s
[m]
a [deg] Phase Count for 2004 call for tender
TCTH.L1.B1 26511.36 0 1 1
TCTV.L1.B1 26513.04 90 1 1
TCTV.R1.B2 145.84 90 1 1
TCTH.R1.B2 147.52 0 1 1
         
TCTH.L2.B1 3214.49 0 1 1
TCTH.R2.B2 3450.23 0 1 1
         
TCTH.L5.B1 (?) 13181.77 0 1 1
TCTV.L5.B1 (?) 13183.45 90 1 1
TCTV.R5.B2 (?) 13475.43 90 1 1
TCTH.L5.B2 (?) 13477.11 0 1 1
         
TCTH.L8.B1 23197.43 0 1 0
TCTH.R8.B2 23433.17 0 1 0
         
Total phase 1     10 10
   
  Number of spares: 1
  Number of components phase 1 with spares: 11
     
  Total to be included in 2004 call for tender: 11

TERTIARY collimators type B
Absorbers for Injection protection type B
   
Basic design parameters
   
TCT(b)
TCLI(b)
Type  
  TCT(b) Tertiary collimator at D1
  TCLI (b) Injection protection at D1
Number of beams in tank 2
Material for jaws  
  TCT(b) W (backup solution: Cu)
  TCLI(b) C-C
Number of jaws in tank 1 (horizontal) or 2 (vertical)
Scheme of jaws parallel jaw surfaces
Collimation plane vertical
Jaw length 1.2 m
  Flat top 1.0 m
  Tapering 0.1 m at each end
Width of jaw tbd
Depth of jaw 25 mm
RF contacts required yes
Cooling of jaw yes
Cooling of vacuum tank yes
Length of vacuum tank 1480 mm
Minimum gap ≤ 4.0 mm
Maximum gap ≥ 60 mm
Distance to center of other beam pipe n/a
Gap control yes
  Gap width yes
  Gap center yes
  Center across zero 5 mm
Angle control (independent per jaw) yes
   
List of components
   
 
Name Location s
[m]
a [deg] Phase Count for 2004 call for tender
TCTV.4L2.B1 3258.95 90 1 0
TCLIA.4R2.B1 3408.18 90 1 0
TCTV.4R2.B2 3405.77 90 1 0
         
TCLIA.4L8.B2 23239.48 90 1 0
TCTV.4L8.B1 23241.89 90 1 0
TCTV.4R8.B2 23388.61 90 1 0
         
Total phase 1 6 0
   
  Number of spares: 2
  Number of components phase 1 with spares: 8
     
  Total to be included in 2004 call for tender: 0

Absorbers for PHYSICS DEBRIS
   
Basic design parameters
   
TCLP
Type Absorbers for physics debris
Number of beams in tank 1
Material for jaws Cu
Number of jaws in tank 2
Scheme of jaws parallel jaw surfaces
Collimation plane horizontal
Jaw length 1.2 m
  Flat top 1.0 m
  Tapering 0.1 m at each end
Width of jaw 80 mm
Depth of jaw 25 mm
RF contacts required yes
Cooling of jaw yes
Cooling of vacuum tank yes
Length of vacuum tank 1480 mm
Minimum gap ≤ 2.0 mm
Maximum gap ≥ 60 mm
Distance to center of other beam pipe ≥ 176 mm
Gap control yes
  Gap width yes
  Gap center yes
  Center across zero 5 mm
Angle control (independent per jaw) yes
   
List of components
   
 
Name Location s
[m]
a [deg] Phase Count for 2004 call for tender
TCL.5L1.B2 26467.50 0 1 1
TCL.4L1.B2 26509.04 0 3 0
TCLP.4R1.B1 149.73 0 3 0
TCL.5R1.B1 190.77 0 1 1
         
TCL.5L5.B2 13138.82 0 1 1
TCLP.4L5.B2 13179.86 0 3 0
TCLP.4R5.B1 13479.02 0 3 0
TCL.5R5.B1 13520.67 0 1 1
         
Total phase 1 4 4
   
  Number of spares: 1
  Number of components phase 1 with spares: 5
     
  Total to be included in 2004 call for tender: 5
     
  Note: Produce 4 "regular" TCL's for installation after about 3 years of LHC operation!

Absorbers for INJECTION PROTECTION Type A
   
Basic design parameters
   
TCLI(a)
Type Absorbers for injection protection
Number of beams in tank 1
Material for jaws C-C
Number of jaws in tank 2
Scheme of jaws parallel jaw surfaces
Collimation plane horizontal
Jaw length 1.2 m
  Flat top 1.0 m
  Tapering 0.1 m at each end
Width of jaw 80 mm
Depth of jaw 25 mm
RF contacts required yes
Cooling of jaw yes
Cooling of vacuum tank yes
Length of vacuum tank 1480 mm
Minimum gap ≤ 2.0 mm
Maximum gap ≥ 60 mm
Distance to center of other beam pipe ≥ 194 mm
Gap control yes
  Gap width yes
  Gap center yes
  Center across zero 5 mm
Angle control (independent per jaw) yes
   
List of components
   
 
Name Location s
[m]
a [deg] Phase Count for 2004 call for tender
TCLIB.6R2.B1 3560.09 90 1 1
TCLIB.6L8.B2 23098.54 90 1 1
         
Total phase 1 2 2
   
  Number of spares: 1
  Number of components phase 1 with spares: 3
     
  Total to be included in 2004 call for tender: 3
     

Absorbers for SHOWERS IN CLEANING INSERTIONS
   
Basic design parameters
   
TCLA
Type Absorbers for physics debris
Number of beams in tank 1
Material for jaws Cu
Number of jaws in tank 2
Scheme of jaws parallel jaw surfaces
Collimation plane horizontal & vertical
Jaw length 1.2 m
  Flat top 1.0 m
  Tapering 0.1 m at each end
Width of jaw 80 mm
Depth of jaw 25 mm
RF contacts required yes
Cooling of jaw yes
Cooling of vacuum tank yes
Length of vacuum tank 1480 mm
Minimum gap ≤ 0.5 mm
Maximum gap ≥ 60 mm
Distance to center of other beam pipe ≥ 194 mm
Gap control yes
  Gap width yes
  Gap center yes
  Center across zero 5 mm
Angle control (independent per jaw) yes
   
List of components
   
 
Name Location s
[m]
a [deg] Phase Count for 2004 call for tender
IR3 Beam 1        
TCLA.A5R3.B1 6755.22 90 1  
TCLA.B5R3.B1 6757.22 0 1  
TCLA.6R3.B1 6843.77 0 1  
TCLA.7R3.B1  6915.18 0 1  
         
IR7 Beam 1        
TCLA.A6R7.B1 20148.09 90 1  
TCLA.C6R7.B1 20178.96 0 1  
TCLA.E6R7.B1 20212.51 90 1  
TCLA.F6R7.B1 20214.51 0 1  
TCLA.A7R7.B1 20231.86 0 1  
         
IR3 Beam 2        
TCLA.A5L3.B2 6574.22 90 1  
TCLA.B5L3.B2 6572.22 0 1  
TCLA.6L3.B2 6485.67 0 1  
TCLA.7L3.B2 6414.27 0 1  
         
IR7 Beam 2
TCLA.A6L7.B2 19840.23 90 1  
TCLA.C6L7.B2  19809.36 0 1  
TCLA.E6L7.B2 19775.81 90 1  
TCLA.F6L7.B2 19773.81 0 1  
TCLA.A7L7.B2 19756.46 0 1  
Total phase 1 16
   
  Note: elements TCLA.7R3.B1 (TCLA.7L3.B2) and TCLA.A7R7.B1 (TCLA.A7L7.B2) are under approval for Beam 1 (Beam 2) integration
   
  Number of spares: 2
  Number of components phase 1 with spares: tbd
     
  Request for IR3 8
  Guess for IR7 8-16
     
  Total guess: 16-24
     
  Total to be included in 2004 call for tender: ?
     

 
Summary:
 
  Total number for 2004 call for tender: 65
  Contribution from TCDI: 12 (?)
  Guess for TCLA: 16-24
     
  Total: 93-101
   
   

  RWA - GRD, Thursday, 05. April 2012 11:07 +0200